Trade fair checklist: from six months before to the day after
Companies that get results from fairs start preparing at least six months ahead. A checklist that shows what to do and when.

The secret of a good fair is the preparation timeline rather than the stand itself. For a custom stand, start at least six months ahead; for a shell scheme or modular stand, six to eight weeks at the latest. The list below orders every step from setting goals to following up after the fair. Shorten or extend it to fit your fair.

Six months before: goal, fair and budget
- Write down the purpose of the fair. New customers, a dealer network, a launch, an export market? Set a measurable goal, such as "60 qualified meetings at the fair".
- Pick the right fair. Visitor profile, previous exhibitor lists and whether your competitors attend are decisive. The wrong fair wastes even the best stand.
- Draw up the budget. Space rental, stand, organiser services, travel, promotion and team. For stand costs see what drives the cost of a stand.
- Apply for space. Good plots go early. If you want a corner or island stand, hurry; we explain the types in stand types.
Four months before: team and brief
- Choose the design team and give them a brief: goal, products on display, required areas (meeting, storage, kitchen), number of staff, brand rules and budget.
- Share the exhibitor manual. Height limits, fire regulations and deadlines shape the design directly.
- Plan any grant application. Some countries support exhibitors at fairs abroad; knowing the conditions early helps you collect invoices and documents correctly. Turkish exporters can find the supported fairs on the Ministry of Trade's trade fair page.
Three months before: design sign-off and production
- Approve the 3D design. Finish revisions now; every change after production starts is expensive.
- Place the production order and put delivery, build-up and dismantling dates in the contract.
- Book travel and hotels. During big fairs hotels fill up months ahead and prices rise.
- Order organiser services: power, water, internet, cleaning, extra badges and catalogue listing. Some fairs offer early-order discounts.
One to two months before: content, print and invitations
- Prepare print: catalogues, brochures, business cards, price lists, sample labels. Print what you need, not more.
- Send invitations. Send existing clients and your target list a personal invitation with your stand number and book meetings in advance.
- Announce it before the fair: a notice on your website, a countdown on social media, the stand number in your e-mail signature.
- Train the team. Who presents which product, how visitors are greeted, how meeting notes are taken? Set up a simple system to mark every visitor "hot, warm or cold".
One week before: final checks
- Confirm that transport has left and when it arrives at the venue.
- Get build-up crew badges and vehicle permits.
- Check samples, print, tablets and chargers, extension leads and spare business cards against one list.
- If possible, rehearse on the stand after build-up: lights, screens, storage layout.
On fair day
- Keep the stand open. Don't block the front with a table; the team shouldn't sit busy on their phones.
- Note every meeting: who, which company, what they were interested in, what was promised.
- Take photos and video. The stand, visitors and product demos are valuable for social media and for designing the next stand.
- Hold a short review at the end of each day. What worked, what should change tomorrow?
The 48 hours after the fair
This is where the real return of a fair shows. Industry research suggests that most of the leads collected at fairs are never followed up. Send a personal e-mail that refers to your conversation and attaches the file you promised. Bulk template e-mails often go unanswered.
Summary checklist
- Goal and budget written down
- Fair chosen, space booked
- Brief given to the design team
- Exhibitor manual shared with the designer
- Grant application and documents planned
- 3D design approved, production contract signed
- Hotels and organiser services arranged
- Print and samples ready
- Invitations sent, meetings booked
- Team trained, note system ready
- Transport and build-up confirmed
- Follow-up e-mails sent within 48 hours
Frequently asked questions
How many months ahead should we prepare?
Six months is ideal for a custom stand. With a shell scheme or modular stand six to eight weeks can be enough, though applying early still pays off for a good plot and affordable hotels.
What is the biggest item in a fair budget?
Space rental and the stand together usually make up the largest share. At fairs abroad, travel, accommodation and transport also take a significant part.
How do I measure success at a fair?
Against the goal you set: the number of qualified meetings, the quote requests received and the sales closed in the three months after the fair. Visitor numbers alone are not a good measure.
Stand design takes the longest part of preparation. Our spaces and exhibitions service follows the process from brief to build-up; send us your fair calendar.